Fan Energy Retrofit Case Studies & Cost-Benefit Analysis

Knowledge Center

Fan Energy Retrofit Case Studies & Cost-Benefit Analysis

I. Introduction

In large-scale ventilation systems used in mining, industrial, and factory settings, fan energy consumption typically accounts for over 30% of total plant electricity use. With rising energy costs and the push for carbon reduction, upgrading fan systems for higher efficiency not only cuts operational expenses but also supports sustainable, green development goals.

II. Energy-Saving Retrofit Technology Paths

Variable Frequency Drive (VFD) Speed Control:
Installing a VFD enables stepless speed regulation of the fan motor, intelligently matching speed to real-time resistance and reducing power consumption by leveraging the P∝n³ relationship.

Guide Vane and Flow Channel Optimization:
Adjusting guide vane angles and blade curvature minimizes aerodynamic separation and recirculation, improving efficiency.

Return Air/Heat Recovery:
Installing heat recovery units at fan outlets or in ductwork allows partial waste heat to preheat supply air, indirectly reducing system load.

Duct Sealing and Damper Upgrades:
Repairing leaking flanges and duct connections, as well as optimizing balance valves and damper control strategies, prevents unnecessary bypass losses.

III. Case Studies

Case 1: Shaanbei Coal Mine Main Ventilation System
Before retrofit: Three 400 kW axial fans; annual power consumption ≈ 10,512 MWh
Retrofit measures:

  • Installed VFDs for on-demand speed adjustment

  • Optimized inlet guide vanes and nacelle sealing
    After retrofit: Average annual energy savings of 28%, ≈ 2,943 MWh/year
    Economic impact:

  • Investment: RMB 2 million

  • At RMB 0.6/kWh, annual savings ≈ RMB 1.76 million

  • Payback period ≈ 1.14 years

Case 2: Large Industrial Plant Recirculation Fans
Before retrofit: Two 200 kW centrifugal fans, oversized airflow, frequent bypass
Retrofit measures:

  • Redesigned guide vanes and implemented VFDs

  • Installed heat recovery coils to use exhaust heat for winter heating
    After retrofit: Fan energy efficiency increased by 22%, annual combined electricity and fuel savings ≈ RMB 680,000
    Economic impact:

  • Investment: RMB 1.2 million

  • Annual total savings ≈ RMB 820,000

  • Payback period ≈ 1.46 years

IV. Cost-Benefit Evaluation Methods

Initial investment:
Equipment (VFDs, guide vanes, recovery units) + installation/commissioning costs

Annual energy savings:
Annual savings = (Electricity saved [kWh] × electricity price) + (Coal saved [tons] × coal price)

Simple Payback Period (PB):
PB (years) = Initial investment / annual savings

Net Present Value (NPV) & Internal Rate of Return (IRR):
For long-term projects, calculating NPV and IRR is recommended to comprehensively evaluate cash flows and capital costs.

V. Implementation Points & Risk Control

  • Site survey: Accurately measure duct resistance curves and load fluctuations to match retrofit solutions

  • Equipment selection: Use high-performance VFDs suitable for heavy-load starts and low-speed operation

  • Commissioning and acceptance: Conduct on-site performance tests post-retrofit, and calibrate CFD model predictions against real data

  • Operations & maintenance training: Regularly train operators and maintenance staff to ensure stable VFD and recovery system operation

  • Safety & compliance: Ensure all work complies with electrical explosion-proof, noise, and vibration standards to safeguard personnel and site

VI. Conclusion

Fan energy-saving retrofits using VFD speed control, aerodynamic optimization, and heat recovery can typically achieve payback within 1–2 years, providing long-term reductions in electricity and fuel costs. When paired with scientific cost-benefit evaluation and rigorous implementation management, such projects can maximize energy-saving potential and help achieve efficient, green, and sustainable ventilation system operation.